Hi Dave,
I've sent you and email, then I saw your latest post on Richdon. Email asked you where you got your concrete from? I've noticed on your pic post concrete and from a post from Richdon about their '3 day pond' that it looks like you've all concreted over your bottom drians. I know that you won't have but just wondering what has happened?
Cheers
Paul
POnd build??
- site admin
- Site Admin
- Posts: 250
- Joined: Wed Jan 09, 2008 1:54 pm
- Location: Prestatyn, North Wales
- Contact:
Re: POnd build??
Hi Paul,
The concrete came from Mixa-Mate, they mix what you require on site and provide a free barrow service, on level ground, not for me LOL.
The bottom drain had a piece of cardboard taped over it whilst the concrete was being poured and leveled, to stop any entering the pipework which has now been removed. But a piece of ply placed on top to stop anything being dropped on it.
Next job block work!
Dave.
The concrete came from Mixa-Mate, they mix what you require on site and provide a free barrow service, on level ground, not for me LOL.
The bottom drain had a piece of cardboard taped over it whilst the concrete was being poured and leveled, to stop any entering the pipework which has now been removed. But a piece of ply placed on top to stop anything being dropped on it.
Next job block work!
Dave.